Difference between revisions of "HG-WELS Spring Calendar"

From CoolWiki
Jump to navigationJump to search
m
m
Line 16: Line 16:
  
  
LUISA'S SCRIBBLE SPACE.... brainstorming on what needs to be done, so that we can map into a calendar. what to do before July, what do do at the visit?
+
=Luisa's Scribble Space....=
 +
 
 +
brainstorming on what needs to be done, so that we can map into a calendar. what to do before July, what do do at the visit?
  
 
Big rocks:
 
Big rocks:
 
*list of coordinates of targets. (done)
 
*list of coordinates of targets. (done)
*Resolution worksheet
+
*Resolution worksheet - working on it
 +
**critical path - spatial resolution of wise v. iras v. 2mass
 
*FinderChart inspection of each object  
 
*FinderChart inspection of each object  
 
**critical path - multiplicity of IRAS sources, even WISE sources.
 
**critical path - multiplicity of IRAS sources, even WISE sources.

Revision as of 20:37, 4 April 2014

The plan!

  • March 7 (Fri) - turn in final version of proposal, wait for comments from reviewers.
  • March 10 - regular telecon, bring any lingering questions about contents of proposal or anything else project-related.
  • March 17 - regular telecon, HAVE DONE by today, Task One: Wiki & Excel training from HG-WELS Spring work - e.g., watch Wiki videos, try your hand at wiki editing, watch Excel video, try your hand at Excel file importing (you can use de la Reza catalog from the next week if you want). Talk on telecon about mechanics of how we will merge these source lists together into one big list of unique objects with all of the ancillary data kept straight.
  • March 24 - regular telecon, HAVE DONE by today, Task Two: Assemble Target Lists from HG-WELS Spring work - e.g., merge the lists yourself. Talk on telecon to compare our results, make sure we've all identified all the duplicates, collected all the data properly, because this is the seed for going forward. If we screw this step up, we will be sorry downstream, so must get this part right.
  • March 31 - regular telecon, can be continuation of prior week, or can be first steps of Resolution work (Task Three on HG-WELS Spring work.
  • April 7 - regular telecon, start to deal with comments from proposal review? This may also be prior week; it depends on what I get back and when and how long it takes me to pull them apart from the original emails and put them back together as a sorted report for each team.
  • April 14 - regular telecon, Resolution?
  • April 21 -
  • April 28 -
  • May 5 -
  • May 12 - Luisa in Leiden (Europe) - no telecon or on your own
  • May 19 -
  • May 26 - Memorial day, no telecon.


Luisa's Scribble Space....

brainstorming on what needs to be done, so that we can map into a calendar. what to do before July, what do do at the visit?

Big rocks:

  • list of coordinates of targets. (done)
  • Resolution worksheet - working on it
    • critical path - spatial resolution of wise v. iras v. 2mass
  • FinderChart inspection of each object
    • critical path - multiplicity of IRAS sources, even WISE sources.
  • obtain ancillary data for targets (2mass, wise, iras; akari, denis; msx, seip)
  • particularly for things with little ancillary data, check why no ancil data. related to FC inspection. coordinate correction
    • folds back into list of coordinates of targets, ancillary data.
    • what fraction have compromised K, W4? can we patch any way?
  • make SEDs. definition of IR ex. measurement error. conceptually pretty much has to come first. maybe work with my SEDs, make own later, after critical path?
  • make color-color diagrams. IR ex. measurement error. scatter.
    • critical path -- identify IRx sources
    • conversion between flux/mag(/energy) to reproduce de la Reza diagrams?